not_runWhen demand spikes, the grid may ask one facility to use less power for a fixed window. If an agent changes the site, amount, or timing, the wrong equipment can move and the settlement can be wrong.
GRACE binds one reference request to one facility, a 18 MW reduction, a 90-minute window, two distinct reference approver signatures, a separately keyed meter statement, and one settlement admission.
Ready to run the reference curtailment.
Pending
Pending
Pending
Pending
Pending
Pending
Each refusal is generated by the same implementation that produced the positive proof.
The exact authorization is presented a second time.
not_run18 MW authorization is reused for a different target.
not_runA meter tries to inject the settlement rule it is supposed to measure.
not_runCOSA and meter integrations on this page are signed reference adapters, not production grid connections. GRACE proves authorization, adapter acknowledgment, evidence integrity, and one-time settlement admission in the reference state machine. It does not prove sensor truth, physical payment, or that no bypass path exists.